Optimised Risk Allocation
KPS specialise in energy supply to the mining industry. Our build, own, maintain contract model (BOM) delivers an optimised life-cycle risk allocation structure. This ensures maximum power supply availability, reliability and fuel efficiency by passing the risk of electricity supply and efficiency to KPS.
Optimised outcomes delivered include:
· All risks associated with design, construction, commissioning and ongoing maintenance passes to KPS;
· The scope / liability gap risk under traditional and separate EPC contract and O&M contract phases is absorbed by KPS; and
· The sole focus of KPS on power generation provides clients early access to new technologies and reliability innovations that reduce electricity supply cost.



